This is a pillar i built using thermolite blocks, it is built in between two window frames, the two planks are to stop the pillar blowing down in heavy wind and rain.
This is a soldier course, it sits on a lintel, there are two weep vents, one in the first perp and one in the last perp, these are used just incase water goes down the cavity.
Here i am laying to the line, the line is on a profile one end of the wall and on a corner block at the other end of the wall, the line must be tight as if it is too slack the wall will not be level
hi, im Daniel Meredith im working as an apprentice bricklayer for Charles Church, i am working on the building site for 4 days a week and i am studying in Pencoed college 1 day a week. This web page is going to show some of the work that i do on the building site. Please feel free to comment on any of my pictures